Precasts

 

 

Each mould is cut into several sections for transport. Moulds are equipped with jockey wheels or scaffold for positioning when empty, i.e. not filled with concrete. The different sections of the moulds are closed by means of Dywidag screws and bars. To facilitate concreting and vibration, two types of solutions are available:

– firstly, two working platforms may be used, one on each side of the mould, which are screwed together.

– secondly by using a practical, lightweight mobile scaffold. This scaffold can be moved from one mould to the next. We recommend a maximum of 1 scaffold every 6 moulds. The mould is opened for removing formwork by a screw extractor located in the the edge of the mould.